Aluepurkaus Made History
Aluepurkaus made history in Porvoo by completing its largest balcony demolition project to date. At As-Oy Porvoon Portti, a total of 414 concrete balconies were
We specialize in facade demolition and have accumulated decades of experience. To date, we have removed approximately 250,000 square meters of facade surface — equivalent to around 140 ice hockey rinks. When you need a reliable partner for facade demolition, turn to Aluepurkaus.
1.
The work begins with an internal inspection. Any cracks or structural anomalies are documented prior to demolition to ensure the work is carried out safely and thoroughly.
2.
Setting up the site typically takes 1–2 days. During this phase, the site is prepared for smooth and safe progress, and, for example, windows are properly protected.
3.
If the structure includes concrete or plaster layers, chiseling is carried out before the actual demolition. This phase generally takes about one day.
4.
The actual facade demolition is carried out efficiently — dismantling a single facade usually takes about one day.
5.
After demolition, protective coverings are removed, insulation materials are dismantled, and the site is thoroughly cleaned and prepared for the next stage. This typically takes around two days.
Whenever demolition takes place, we bring you the latest insights and stories from the demolition industry.
Aluepurkaus made history in Porvoo by completing its largest balcony demolition project to date. At As-Oy Porvoon Portti, a total of 414 concrete balconies were
A large leaking glass roof is being dismantled. Each glass pane weighs 150 kg, and the demolition conditions are challenging because there is a 30-meter
On April 5, 2023, ScanWorks Oy and Turun Aluekierrätys Oy agreed on a transaction in which the entire business operations of Helsingin Aluepurkaus Oy were
1.
Send us a request for quotation. We review the site and relevant documents (structural drawings, hazardous materials report, etc.), after which we prepare calculations and agree on the detailed scope of work.
2.
Following successful negotiations and signing the contract, we prepare the demolition work plan and safety plan.
3.
Includes a kickoff meeting, safety briefing, and staff induction.
4.
At this stage, we carry out the demolition, clean the site, and finally sort the materials for recycling.
5.
We deliver all necessary reports and load tickets to the client and handle invoicing. Once the invoice is settled, the project is officially complete.
Fill in the fields on the side and tell us about your demolition project — we respond quickly and tailor a proposal to meet your needs. Let’s carry out a safe and efficient demolition together!
You can also call us directly at: +35840 052 6885
NEED SOMETHING DEMOLISHED? Call Jukka!
Jukka Vesalainen
Phone: +358 400 526 885
jukka.vesalainen@aluepurkaus.fi